BEFORE THE ARCHITECT BUILDER HOME DRAWING UNIQUE HOME PLANS & ELEVATIONS
Foundations For Home Building, Continuous Stem Wall . . . unusual
· · · · · · ·
Plans & Elevations, Spa enclosure . . . major
Schematics, Home Plumbing Layout, Roughed
HOUSE PLAN Details, Foundations For Home Building, Continuous Stem Wall . . . unusual
And
MODEL HOME DRAWING, Home Design, Spa Enclosure
Here we'll take a brief, three-picture look at the Spahaus' unusual foundation overall, leaving the nitty-gritty house plan details to other case studies.
The first in this series of three is an annotated plan view (elsewhere in the related prints it is clearly identified that the foundation in elevations is to be uniplanar to the horizontal, no steps, no breaks, no inclines, no declines). This home drawing indicates what foundation elements go where, and refers by letter code to the 5 (A-F) different home drawing of house plan Details plotted in another section of Plans & Elevations. The smaller, octagonal, concrete foundation band around the tub's independent and precedent concrete pad arose from not only the unreliability of the tub's existing concrete pad in regard to bearing perimeter load from the Spahaus structure, but also its 3" over grade elevation to its top face which developed to be about 3" lower than the top face of the continuous, concrete stem wall and new concrete pad, i.e., not only could we not discern any footing to the existing pad, but also we could not live with just a 3" lift over grade for our new pad and wall.
There are lots of abbreviations in this home drawing which cryptics are identified item-by-item in a glossary, key, or legend printed somewhere on these home drawing sheets. For your own understanding, this is what each abbreviation means on this sheet: CONC=concrete; EXG=Existing; FTNG=Footing; FNDN=Foundation; INCg=Including; OGL=Over Grade Level; PRM=Perimeter; TS=To Scale (1/4":1"-0", as plotted); WL=Wall.
· · · · · · ·
Next, the same plan view, but this time with measurements. It's tough to tell what dimensions are more important than other dimensions to a concrete or foundation contractor when you're home drawing plans to building home foundations nowhere nearby. Some contractors prefer measuring on-center, some from centerlines to different points, some from outside or inside corners of formwork. This home drawing shoots at all of these one way or another, trying not to look too cluttered.
A couple more abbreviations: DIMs=Dimensions; MSRD=Measured.
· · · · · · ·
Finally, just to make sure nobody gets the wrong idea about how this unusual grouping of shapes fits together, the AG took the plan view and rotated it 45-degrees along the upper axis. Nowhere to run, nowhere to hide. As both home designer and home builder, the AG really appreciates these unconventional views of a complex project. No foundation or cement contractor in his right mind would object to two different looksees at the same projected, potentially difficult formwork and pour long before the cement delivery trucks roll up to the work site.
The last of the abbreviations for today: BEL=Below; DK=Deck; FOC=Face of concrete; INT=Interior; NTS=Not To Scale (meaning in this home drawing as plotted that the scale is not the overall scale of 1/4":1'-0", noting separately on the home drawing that the scale is 75% of the overall scale).
· · · · · · ·
About Us ◊ jrp2h2000@yahoo.com ◊ 770-889-6964 ◊ Site Map
Before The Architect does not endorse any links. Anything you do with any links is solely between you and them.
(If this is your first visit to Before The Architect, please consider spending a few moments looking over the Site Map, in order to get a feel for the website design. Before The Architect E-mail: jrp2h2000@yahoo.com.)