HOME BUILDING PLANS - BEFORE & AFTER
HOME PLAN -
METAL CONNECTOR SCHEDULE
Once in a while, I come across a structure that belongs in an home designing hospice. I reckon that's why God made engineers and bulldozers. AG '04
· · · · · · ·
"Please help me I'm falling...." (words and music by Hanck Locklin) is what's down when a home structure in seismic Zone 2B can get to shake and bake showtime. Reinforcement and connector schedules are so puny to AG's experience when done by others, he opted for sidewalk art by Julian Beever.
· · · · · · ·
AFTER
AG does not often get a request to specify metal connectors, but when he does, this is what a scheduled reply could look like. In this instance, AG passed over repetition of very detailed reference to slab-on-grade connections in the Foundation Plan. While Before The Architect home design standards are generally stiffer than most codes, you’ll see a further stiffening herewith as the home building site is in Seismic Zone 2B.
This schedule and others involving certain matters such as shearwalls and bracing AG directed to an engineer's final approval.
Reinforcement and Connector Schedule
· · · · · · ·
About Us ◊ jrp2h2000@yahoo.com ◊ 770-889-6964 ◊ Site Map• Privacy Policy
Before The Architect does not endorse any links. Anything you do with any links is solely between you and them.
· · · · · · ·
(If this is your first visit to Before The Architect, please consider spending a few moments looking over the Site Map, in order to get a feel for the website design. Before The Architect E-mail: jrp2h2000@yahoo.com.)