HOUSE PLAN DETAIL - EMERGENCY EGRESS SCHEDULE
. . . . . . . . .
BEFORE
This could figuratively be the outcome for owners not getting the matter of emergency egress well-established from the get-go:
Emergency egress compliance is usually not tough at all on the front-end of a house plan design, and, potentially can disruptive to a higher and higher degree as a house plan matures. Overall and as with natural illumination, degree of difficulty rises with story-and-a-half structures
. . . . . . . . .
AFTER
Who cares? If the house plan designer doesn’t, it is possible that no one else will.
|
It’s easier, safer, more satisfying to lay up this schedule in a plan set than not. | |
|
Code metrics are very clear to the point of being almost deceptively clear. | |
|
At least the better window and door manufacturers are up-front with related statistics. | |
|
This schedule is not a stretch; this schedule represents good house plan designing. | |
|
In the opinion of Before The Architect, this house plan set schedule checks off a key safety concern. |
Here’s an house plan Detail - Emergency Egress Schedule from a Before The Architect house plan set.